BoreSheet
New job
GroundBorePit zoneUtility
Company Add your logo & contact for the PDF

We'll fill in your logo, phone, email and address.

Logo
Drop or paste a logo, or

Saved on this phone for every job. Never uploaded.

Job

Bore
Rods, pipe & reamer

Ground

Stand at each pit and tap to save GPS points (used for the map, KML and the ground estimate).

Station = ft from entry. Elevation from any level or rod reading (same datum). Empty = flat.

Utilities to cross
Rod log

Add soil / rock and notes per rod. Import your locator log to show the as-built path.

RodStaDepthPitchSoilNote

Depth = ground to bore center at end of each rod. Pitch % negative = nose down.

Inspector page

BoreSheet — planning aid only, not a stamped engineering design. Field locate and verify all utilities (call 811) before drilling.

Jobs

Share & export

Import locator log

We guessed the columns. Fix any that look wrong.

Crop logo

Drag a box around the logo.

What should be better?

Opens your email app with the message ready to send. Nothing is stored by BoreSheet.